SI AERO was contracted by PBB manufacturer ADELTE to design and supply the entire underground PCA pipe required for the PCA Ground Pit for the 15 stands positions. It was also included the detailed lay-out design with the location of each PCA Ground Pit.
Based on the lay-out SI AERO provided all the underground PCA pipe needed to connect the PCA machine adn the PCA Ground Pit including pipe elbows and PCA connection pipe.
SI AERO managed also the transport and installation supervision of this activities during all project execution