Project Management on behalf of Tianda Latin America for the supply and installation of 4 PBBs CIMC-Tianda among 3 of them for two stands for the A380. The project also include fixed GPU 400Hz installed through 400Hz in-ground Pits
Project Management on behalf of Tianda Chile for the supply and installation of 51 PBBs CIMC-Tianda with auxiliary equipment (GPU, PCA, VDGS, IASS). The extension of Santiago Chile airport is executed by CJV (Astaldi + Vinci Construction Grand Projets) for Nuevo Pudahuel Airport Concessionaire (Aeroports de Paris + Vinci Airports)
Contracted by ICAO complete follow up Project from technical specification review, offer analysis and recommendations, submittal revision and approvals. Factory Acceptance Test and Site Acceptance Test
Project executed by Jetway
SI AREO performed onsite visit to Salvador Bahia Airport to inspect the PBBs from Thyssen Krupp. After the site visit, SI AERO prepared the technical proposal submitted by Tianda Consultoria e Serviços Especiais Ltda for the upgrade of 9 PBBs. Tianda Consultoria e Serviços Especiais Ltda was awarded with the project by airport concessionaire Vinci Airports
Contracted by L&T as EPC contractor from 2010 to 2015. Complete follow up Project from technical specification review, offer analysis and recommendations, submittal revision and approvals. Factory Acceptance Test and Site Acceptance Test
Phase 1: 17 - Shinmaywa PBB
Phase 2&3: 36 - TKAS PBB
Phase 4: 18 - CIMC-TIANDA PBB
•Complete follow up Project from preparation of technical specification, tender preparation and review, offer analysis and recommendations for PBB retrofit and two years complete maintenance services for T1 terminal with 34 PBB equipped with PCA and 400Hz - GPU
SI AERO was contracted by PBB manufacturer ADELTE to design and supply the entire underground PCA pipe required for the PCA Ground Pit for the 15 stands positions. It was also included the detailed lay-out design with the location of each PCA Ground Pit.
Based on the lay-out SI AERO provided all the underground PCA pipe needed to connect the PCA machine adn the PCA Ground Pit including pipe elbows and PCA connection pipe.
SI AERO managed also the transport and installation supervision of this activities during all project execution
Consultancy for detail installation design and implementation of 400Hz GPYU and PCA on existing installed Shinmaywa and TKAS PBB
Contracted by Millennium, installer contractor under GMR supervision